+44 1642 204618enquiries@tricore-ts.com

Home / Services / Electrical Engineering

Electrical engineering for energy infrastructure

Cable testing, jointing and terminations across HV, MV, LV and fibre optic, delivered by specialist project teams with QA/QC oversight from mobilisation to handover.

Tricore technician carrying out cable work on site
Overview

Cable testing, jointing & terminations

Our team brings more than 300 years of combined industry experience across electrical engineering, cable installation and offshore operations. We specialise in full-lifecycle cable testing, jointing, termination and fault detection, from cable fabrication and Factory Acceptance Testing through termination, energisation and system handover.

High-voltage terminations at 33 kV and 66 kV are backed by pre- and post-termination testing, and pre- and post-spooling tests protect cable integrity through handling and load-out. Whether the scope is offshore wind, a substation, a containment system or installation in a hazardous zone, results are safe, compliant and recorded in Core as they happen.

Test methods
  • OTDROptical time-domain reflectometry for subsea fibre diagnostics
  • TDRTime-domain reflectometry for fault location
  • VLFVery low frequency withstand testing
  • LIRALine resonance analysis for condition assessment
  • IRInsulation resistance testing
  • DACDamped AC testing with partial discharge
  • FATFactory acceptance testing at fabrication
Capabilities

What you get with Tricore

Specialist engineers and test technology for energy infrastructure, with every result recorded in Core from mobilisation to handover.

Global reach

Rapid mobilisation, even for urgent cable faults

Teams deployed to Taiwan, the Netherlands, Scotland, India and beyond.

UKNLTWIN

Lessons learned
9/10

Average client score in our lessons-learned reviews.

Terminations
66kV

33 kV and 66 kV HV terminations.

Instant documentation

Results straight into Core

No re-keying, fewer errors, full traceability.

Load-out

Pre- and post-spooling tests

Cable integrity protected through handling and movement.

Seamless integration

We work inside your operation

Strategic guidance, transparent reporting and document control with minimal disruption to your workflows.

How we deliver

From first test to final handover

A clear sequence, with every result captured in Core as it happens.

01

Factory acceptance

FAT at the cable factory before shipment.

02

Load-out & spooling

Pre- and post-spooling tests during handling.

03

Jointing & termination

33 kV / 66 kV jointing and terminations with pre-termination tests.

04

Post-installation tests

OTDR, VLF, IR and DAC to prove every string.

05

Energisation & handover

Complete digital test packs for close-out.

Everything Tricore does is focussed on cutting your costs of non-quality. If you need this, then I’d recommend that you talk to them.
Rich Furniss

OWGP Consultant, Offshore Wind Growth Partnership

On site

Electrical engineering in action

HV and fibre optic testing, jointing, stripping and terminations by Tricore technicians.

Contact

Eager to innovate with us?

Tell us about your scope, demo request or cable fault and we will connect you with the right specialist.